WCE Expects Over 160,000 Daily Vehicles This Deepavali
Heading out for the holidays? WCE expects over 160,000 daily vehicles this Deepavali. Check peak travel times and route tips to avoid delays and travel safely.
Lebuhraya WCE announced extensive traffic management preparations in Malaysia on 5 November 2026, anticipating that over 160,000 vehicles per day will use the West Coast Expressway during the upcoming Deepavali festive weekend and the replacement holiday on Monday.
Highway operator Lebuhraya WCE confirmed that non-emergency construction and maintenance work requiring lane closures is temporarily suspended from 6 November to 10 November 2026. This traffic projection forms part of an estimated 3.28 million vehicles expected on major highways nationwide during peak festive days, according to the Malaysian Highway Authority (LLM).
Key Facts
The key operational facts for the West Coast Expressway during Deepavali 2026 include an anticipated daily volume exceeding 160,000 vehicles, the suspension of lane closures from 6 to 10 November 2026, full Touch 'n Go PayDirect tolling support, and active emergency patrols.
| Attribute | Value |
| Highway | West Coast Expressway (WCE / Lebuhraya Pesisiran Pantai Barat) |
| Highway Operator | Lebuhraya WCE |
| Projected Daily Traffic | Over 160,000 vehicles per day |
| Nationwide Peak Travel Projection (LLM) | 3.28 million vehicles |
| Lane Closure Suspension Period | 6 November to 10 November 2026 |
| Lane Closure Suspension Exemption | Emergency and immediate repair works |
| Emergency Highway Assistance | Highway patrol, Emergency Response Team (ERT), and tow trucks |
| Rest and Service Areas (R&R) | 6 locations |
| R&R Locations with Food Stalls | R&R Sungai Nyior and R&R Bukit Kapar |
| Electronic Toll Payment System | Touch 'n Go PayDirect (all WCE toll plazas) |
| Mobile Application | WCE App (real-time traffic, CCTV, AI assistance, route navigation, EV charging locators) |
**Lebuhraya WCE projects that more than 160,000 vehicles daily will use the West Coast Expressway during Deepavali 2026, with lane closures suspended between 6 and 10 November.**
What Traffic and Emergency Measures Are Planned for WCE During Deepavali?
WCE is managing Deepavali holiday traffic by temporarily halting highway construction and maintenance work requiring lane closures from 6 to 10 November 2026. Furthermore, highway patrol units and Emergency Response Teams remain on constant standby alongside tow trucks stationed at strategic locations to provide rapid assistance during breakdowns or accidents.
Managing Director of Lebuhraya WCE, Lyndon Alfred Felix, stated that the suspension of maintenance works excludes urgent repairs requiring immediate rectification. He noted that operational readiness is in place, though road safety continues to rely heavily on individual driver responsibility and cautious motoring habits throughout the festive period.
"Pasukan operasi kami telah bersedia untuk menghadapi peningkatan trafik sepanjang tempoh ini. Namun begitu, keselamatan di jalan raya turut bergantung kepada sikap dan tindakan setiap pemandu," Lyndon Alfred Felix, Pengarah Urusan Lebuhraya WCE
Motorists are advised to conduct routine maintenance checks on tyres, braking systems, and fluid levels before travelling, whilst observing posted speed limits and safe following distances.
**Lebuhraya WCE has suspended non-emergency construction and maintenance lane closures from 6 to 10 November 2026 while deploying round-the-clock emergency response teams and tow trucks.**
What Digital Services and Rest Facilities Are Available on WCE?
WCE provides motorists with the mobile WCE App featuring artificial intelligence assistance, real-time traffic updates, live CCTV feeds, route guidance, and electric vehicle charging station locators. Motorists can also use six Rest and Service Areas, including Sungai Nyior and Bukit Kapar, alongside Touch 'n Go PayDirect toll payment facilities.
The highway concessionaire has deployed the Touch 'n Go PayDirect system across every toll plaza on the West Coast Expressway to expedite digital payments and ease congestion. Drivers requiring stopovers can access six Rest and Service Areas offering core amenities including vehicle parking bays, surau prayer facilities, and public toilets, with food stalls operating at selected rest stops such as R&R Sungai Nyior and R&R Bukit Kapar.
**All WCE toll plazas support Touch 'n Go PayDirect transactions, while the WCE App provides real-time CCTV feeds and EV charging station locations.**
Who Is This For in Malaysia?
This travel advisory is for Malaysian holidaymakers, electric vehicle drivers, and daily commuters travelling along the west coast corridor over Deepavali and the replacement holiday on Monday. It specifically assists drivers navigating peak congestion, seeking Touch 'n Go PayDirect toll payment, or locating highway amenities and EV charging points via the WCE App.
Highway users on the WCE represent a portion of the broader 3.28 million vehicles forecast by the Malaysian Highway Authority (LLM) to travel on major nationwide routes during peak festive dates. Concessionaire management urges travellers to plan journey schedules in advance, stay attentive to route conditions, and exercise consideration towards fellow road users.
**Malaysian holidaymakers and electric vehicle drivers travelling along the west coast corridor can access six WCE rest areas and real-time travel updates via the WCE App.**
Common Questions
Common questions regarding West Coast Expressway travel during the 2026 Deepavali festive period address scheduled construction suspensions, accepted toll payment methods, and driver amenities. Official highway concessionaire Lebuhraya WCE has provided specific guidelines covering lane closures, Touch 'n Go PayDirect implementation, and Rest and Service Area locations.
Are highway lane closures suspended on WCE during the Deepavali weekend?
Yes, Lebuhraya WCE has temporarily suspended all construction and maintenance work requiring lane closures from 6 to 10 November 2026. However, this postponement strictly does not apply to emergency or critical repair operations that require immediate action to ensure driver safety.
Can drivers pay toll using Touch 'n Go PayDirect on the West Coast Expressway?
**Touch 'n Go PayDirect is fully available at all WCE toll plazas to facilitate seamless transactions for highway users.** Managing Director Lyndon Alfred Felix confirmed this payment option operates alongside the WCE App to assist motorists throughout the peak Deepavali festive travel period.
Where can motorists find food stalls and EV chargers along WCE?
Motorists can find food stalls at selected Rest and Service Areas including R&R Sungai Nyior and Bukit Kapar among six operational R&Rs. Electric vehicle charging stations can be located using the mobile WCE App, which also provides real-time traffic updates and route navigation.
Sources and Methodology
This documentation synthesises operational details and traffic projections published by Careta and Sinar Harian regarding the West Coast Expressway ahead of Deepavali 2026. All source facts were translated from Malay into British English without external extrapolation, capturing data from highway concessionaire Lebuhraya WCE and the Malaysian Highway Authority.
The primary source report is "WCE Jangka Lebih 160,000 Kenderaan Sehari Sempena Deepavali", published by Careta with reporting from Sinar Harian.
Original report: Careta
**All operational figures, dates, and traffic forecasts are translated from the original Malay report by Careta and Sinar Harian without independent aggregation.**
No currency values were reported in the original text, requiring no currency conversions. All source material was translated from Malay into British English.
This article is based on the source report above and was last updated on 6 November 2026.
Related coverage
- Jetour T1 PHEV Debuts with 1,300km Range from RM 73,700
- Zontes 552 Series Debuts with Four Variants for Malaysia
- Renault 5 Turbo 3E Debuts With 547 HP at RM 770,000
- Proton Sales Momentum Continues With Robust Market Demand
- Proton Hits 21,624 Sales in October Nearing 200,000 Units
- Yamaha Unveils RW350 to Enter 300cc ADV Scooter Segment