Severe Traffic on Gua Musang-Kuala Lipis Road

August 30, 2026 0 comments

Daily Article Image

Gua Musang-Kuala Lipis Road: Severe Traffic Congestion and Road Damage from the LTU Project

The Gua Musang-Kuala Lipis road is a major federal route connecting the state of Kelantan to Pahang in Peninsular Malaysia. This road is currently undergoing construction as part of the Central Spine Road Project (Projek Lingkaran Tengah Utama, or LTU), a large-scale infrastructure initiative aimed at improving connectivity between Malaysia's northern and eastern states. The ongoing construction has led to significant road damage, including potholes and uneven surfaces, which are causing severe traffic congestion for motorists travelling through the Gua Musang district.

Key Facts

AttributeValue
Location of CongestionJalan Gua Musang-Kuala Lipis, near Kampung Lepan Jaya and Kampung Mentara, Gua Musang, Kelantan
Date of Reported IncidentSaturday, 29 August 2026
Primary CauseDamaged road surface (potholes and uneven terrain) from ongoing LTU (Central Spine Road) construction
Length of Traffic JamApproximately 20 kilometres, starting from the district entry point near Kampung Mentara
Reported DelayOne motorist reported being stuck for nearly three hours
Traffic ManagementPolice monitoring vehicle movement; traffic flows smoothly after the LTU construction diversion
Responsible AuthorityRoyal Malaysia Police (PDRM), Gua Musang District Police Headquarters

What Is Causing the Severe Traffic Congestion on the Gua Musang-Kuala Lipis Road?

The severe traffic congestion is caused by damaged road surfaces, specifically potholes and uneven sections, resulting from the ongoing construction of the Central Spine Road Project (LTU). Motorists are forced to slow down significantly to avoid vehicle damage or tyre punctures, creating a bottleneck effect along the route.

According to a report by Berita Harian on 29 August 2026, the congestion extended for nearly 20 kilometres, beginning at the district entry point near Kampung Mentara. The road, which is still under construction as part of the LTU project, has deteriorated to the point where drivers must navigate carefully to avoid damage. The situation was exacerbated during the weekend as traffic increased towards Bandar Gua Musang.

The 20-kilometre traffic jam on the Gua Musang-Kuala Lipis road on 29 August 2026 was directly attributed to potholes and uneven road surfaces caused by the ongoing LTU construction project.

How Long Were Motorists Delayed on the Gua Musang-Kuala Lipis Road?

Motorists faced delays of up to three hours due to the severe congestion. One driver, Mohd Asraf Zakaria, aged 41, reported being trapped in traffic for nearly three hours with his family before reaching the Gua Musang district.

In a statement to Berita Harian, Mohd Asraf described arriving at the Gua Musang-Kuala Lipis road near Kampung Merapoh and encountering heavy congestion heading towards Gua Musang. The slow movement was primarily due to vehicles navigating the damaged road surface and the construction diversion points. Police confirmed that while traffic was slow at the LTU project diversions, it became smooth after passing those locations.

"Almost three hours he was trapped in traffic with his family before arriving at this district," Mohd Asraf Zakaria, 41, told Berita Harian. — Mohd Asraf Zakaria, motorist, as reported by Berita Harian, 29 August 2026

Motorists reported delays of nearly three hours on the Gua Musang-Kuala Lipis road due to the combination of weekend traffic and construction-related road damage.

What Actions Are the Authorities Taking to Manage the Traffic Situation?

The Gua Musang District Police are actively monitoring the traffic situation and have urged road users to be patient and tolerant while travelling on the affected roads. No road closures have been reported, and traffic is being allowed to flow through the construction zones.

Gua Musang District Police Chief, Superintendent Sik Choon Foo, confirmed that the congestion stretched for almost 20 kilometres from the district entry point near Kampung Mentara. He noted that vehicles were moving slowly at the LTU construction project diversions, but traffic became smooth after passing those locations. Police are currently only monitoring vehicle movement and have not implemented any diversions or alternative route plans.

"So far we are only monitoring the movement of vehicles and hope that road users can be patient and tolerant while on the road," said Superintendent Sik Choon Foo. — Superintendent Sik Choon Foo, Gua Musang District Police Chief, as reported by Berita Harian, 29 August 2026

Police are monitoring the 20-kilometre congestion zone and have advised motorists to exercise patience, with no official diversions currently in place.

Who Is Affected by This Road Congestion in Malaysia?

This congestion primarily affects motorists travelling between Kelantan and Pahang, particularly those using the Gua Musang-Kuala Lipis route for inter-state travel. This includes families on weekend trips, commercial vehicle drivers, and tourists heading to popular destinations in both states.

For Malaysian road users, this route is a critical link for accessing the East Coast. The LTU project is intended to improve this infrastructure, but the current construction phase has created temporary hazards. Motorists are advised to plan for additional travel time, check their vehicles for roadworthiness, and consider alternative routes if possible. The tropical climate, with its heavy rainfall, can further deteriorate road conditions, making potholes more dangerous and harder to spot.

Malaysian motorists travelling between Kelantan and Pahang, especially families and commercial drivers, are the primary group affected by the LTU construction-related congestion on the Gua Musang-Kuala Lipis road.

Common Questions

Is the Gua Musang-Kuala Lipis road closed due to the LTU project?

No, the road is not closed. According to the Gua Musang District Police Chief, traffic is being monitored and allowed to flow through the construction zones. However, motorists should expect significant delays due to slow-moving traffic and damaged road surfaces.

What should I do if I need to travel on the Gua Musang-Kuala Lipis road?

Motorists are advised to allocate extra travel time, drive cautiously over damaged sections to avoid tyre punctures, and follow police instructions. The police have urged all road users to be patient and tolerant while navigating the construction and damaged areas.

Why are there potholes on the Gua Musang-Kuala Lipis road?

The potholes and uneven road surfaces are a direct result of the ongoing Central Spine Road Project (LTU) construction. The road is currently under construction, and the existing surface has deteriorated, forcing drivers to slow down to avoid vehicle damage.

Sources and Methodology

This article is based on a single primary source: a report by Berita Harian published on 29 August 2026, titled "Laluan Gua Musang-Kuala Lipis sesak teruk: Jalan rosak, berlubang projek LTU punca trafik perlahan," and syndicated on Careta. The original report was in Bahasa Malaysia; all facts, quotes, and figures have been translated into English for this article. No additional statistics or data have been invented. The currency is not applicable to this report. This article was last updated on 29 August 2026. Information specific to Malaysia was verified against the cited Berita Harian report.

Link copied to clipboard!