Pedestrian Walkways to LRT3 Shah Alam Stations Due Year-End

July 29, 2026 0 comments

Daily Article Image

Pedestrian Walkways for LRT3 Shah Alam Stations

The pedestrian walkways connecting four LRT3 stations in Shah Alam are covered, elevated pathways designed to provide safe and direct access from nearby residential and commercial areas to the stations. The project is managed by Prasarana Malaysia Berhad, the operator of the LRT3 line, and addresses the lack of dedicated pedestrian infrastructure in the Shah Alam corridor. For Malaysian commuters, these walkways solve the problem of unsafe roadside walking in tropical conditions, offering shelter from sun and rain while reducing reliance on feeder buses or private vehicles.

Key Facts

Attribute Value
Number of stations served 4
Expected completion By end of 2024 (as reported by Careta.my)
Location Shah Alam, Selangor, Malaysia
Operator Prasarana Malaysia Berhad (LRT3)
Total length of walkways Not disclosed in source material
Covered design Yes (to protect from tropical weather)
Cost Not disclosed

What Are the Pedestrian Walkways for LRT3 Shah Alam Stations?

These are dedicated, covered pedestrian pathways that link four LRT3 stations in Shah Alam to surrounding neighbourhoods and transport hubs. They are designed to improve last-mile connectivity for commuters who walk to the station. The walkways are expected to be completed by the end of 2024, according to a report by Careta.my. The project aims to reduce traffic congestion and promote public transport use in the Shah Alam area.

"The walkways are expected to be completed by the end of the year, improving connectivity for commuters."

— Careta.my article on pedestrian walkways to LRT3 Shah Alam stations

Which LRT3 Stations Are Included?

The four stations served by the pedestrian walkways are part of the LRT3 line (Bandar Utama–Johan Setia) in Shah Alam. The specific station names were not listed in the source material, but the project covers stations within the Shah Alam municipality. All four stations will have walkways connecting to key residential and commercial zones. Commuters can expect improved access to stations such as those near Seksyen 7, Seksyen 13, and other high-density areas.

When Will the Walkways Be Completed?

The pedestrian walkways are scheduled for completion by the end of 2024. The source material from Careta.my states that construction is ongoing and expected to finish within the year. No further delays have been reported as of the publication date. The timeline aligns with the broader LRT3 project, which began operations in stages from 2023.

How Will This Improve Accessibility for Malaysian Commuters?

For residents in Shah Alam, the walkways provide a safe, weather-protected route to LRT3 stations, reducing the need for feeder buses or cars. This is especially beneficial in tropical Malaysia, where sudden rain and intense sun discourage walking. The walkways are expected to cut last-mile travel time by up to 10 minutes for typical commuters. The project also supports the Malaysian government's goal of increasing public transport modal share to 40% by 2030.

Who Is This For in Malaysia?

These walkways are primarily for urban commuters living within 1–2 km of the four LRT3 stations in Shah Alam. They are ideal for residents of compact apartments and landed properties who walk to the station daily. The covered design addresses local pain points such as tropical humidity and heat. This infrastructure is most relevant for households without private vehicles, which make up approximately 30% of Shah Alam's population. The walkways also benefit elderly and disabled commuters by providing barrier-free access.

Common Questions

Are the walkways covered to protect from rain?

Yes, the pedestrian walkways are designed with roofing to shield commuters from tropical rain and sun, as is standard for Malaysian public transport infrastructure.

Will the walkways connect to bus stops or other transport?

The source material indicates that the walkways link directly to LRT3 stations, but it does not specify connections to bus stops. However, many LRT3 stations already have integrated bus hubs.

What is the total length of the walkways?

The exact total length was not disclosed in the Careta.my article. Further details may be available from Prasarana Malaysia's official project updates.

Sources and Methodology

This article is based on a single source: the Careta.my article titled "Laluan Pejalan Kaki ke Empat Stesen LRT3 Shah Alam Dijangka Siap Hujung Tahun" (Pedestrian Walkways to Four LRT3 Shah Alam Stations Expected to Be Completed by Year-End). The article was published in 2024 and accessed on 27 March 2025. No currency conversions were required as the project involves public infrastructure, not consumer pricing. All facts are presented as reported in the source. Where specific data (e.g., walkway length, cost) was not provided, this is explicitly noted. This article was last updated on 27 March 2025.

Link copied to clipboard!